- Proof of operational procedures and training; details of these can be found on the application form or obtained from the Luftfahrt-Bundesamt.
- For changes: Proof of changes
- If you are applying on behalf of another person or organization, you will need a power of attorney.
The following documents are required for the first application for the most frequently requested permits:
Specialized High Risk Operations (SPO High Risk)
- Declaration for all procedures and aircraft
- Documentation of operational procedures and training procedures in the operations manual or in the SPO operations manual
- Evidence of the Standard Operating Procedures (SOP)
- Risk Assessment
- Minimum Equipment List (MEL) for all aircraft
- if additional equipment is used: Proof of equipment for all aircraft
- Evidence of training performance, if already available
Emergency medical helicopter missions (HEMS)
- Safety Risk Assessment
- Supplemental Type Certificate (STC)
- Changes to OM-A
- Changes to OM-B
- Training and inspection programs in OM-D
- Evidence of training implementation, if already available
- Rescue station checklist
- Equipment checklist
- Attachment to the application (compliance list)
Helicopter winch operation (HHO)
- Flight Manual Supplement
- Safety Risk Assessment
- Changes to OM-A
- Changes to OM-B
- Training and inspection programs in OM-D
- Proof of training implementation, if already available
- Annex to the application (Compliance List)
Offshore helicopter operations (HOFO)
- Safety Risk Assessment
- for difficult environmental conditions: Proof of approval for the installation and operation of the ditching equipment in the (Supplemental) Type Certificate ((S)TC) per aircraft
- Changes to OM-A
- Changes to OM-B
- Training and inspection programs in the OM-D
- Proof of training implementation (if already available)
- Annex to the application (Compliance List)
Night vision systems (NVIS)
- Safety Risk Assessment
- (Supplemental) Type Certificate ((S)TC)
- if available: Operator Substantiation Report For Night Vision Imaging Systems (NVIS) / NVG)
- Changes in OM-A
- Changes in OM-B
- Training and verification programs in OM-D
- Proof of training implementation (if already available)
- Annex to the application (Compliance List)
Electronic pilot bag (EFB)
- for devices over 1 kilogram that affect the structure of the aircraft: Technical certificate (TCDS or STC)
- if a pressurized cabin is present: Proof of resistance to pressure loss
- if IFR cards installed on a portable device are used as the primary source: Proof of Electromagnetic Inference (EMI) test
- EFB manual or sections in the OM-A
- Training and verification programs in OM-D
- Proof of training
- Annex to the application (Compliance List)
Transportation of dangerous goods (DG)
- Personnel category 6 certificate in accordance with ICAO T.I. Part 1 Chapter 4 (IATA 1.5)
- Changes in OM-A
- Training programs in OM-D
- if cargo holds are available: Proof of hold classification for each aircraft
Performance Based Navigation (PBN)
- Proof of approval for PBN operation
- Changes in OM-A
- Changes to OM-B
- Training and inspection programs in OM-D
- Proof of training implementation (if already available)
- Safety assessment
- if available: Document on the reporting system
- if available: Document on the monitoring program
- Annex to the application (Compliance List)
Public Interest Site (PIS)
- Changes in OM-A
- Changes in OM-B
- Changes in OM-C
- Training and inspection programs in OM-D
- Evidence of training performance (if already available)
Non-commercial and specialized flight operations of aircraft of an AOC holder by another operator
- Changes in OM-A
- Changes to OM-B
- if parts of the procedure or the entire procedure are described in a contract: Model contract
- Risk Assessment
- Compliance List
Depending on the approval, other documents may be required.