Applying to supplement or amend a special operating plan for mining

Source: BUS Rheinland-Pfalz

An operating plan serves to monitor operations. In order to establish and manage a mining operation, you as an entrepreneur need an approved operating plan. The competent mining authority may require you to draw up special operating plans for special work and facilities that are not suitable for inclusion in the main operating plan due to their level of detail.

If you wish to subsequently supplement this special operating plan or change individual components, you must apply for approval.

An operating plan includes comprehensive explanations and planning documents for planned mining measures, for example

  • Location and extent,
  • technical implementation
  • time planning,
  • possible effects on people and the environment,
  • measures to avoid and minimize negative effects on the environment,
  • operational and occupational safety.

Special operating plans contain measures which, although part of the main operating plan, cannot be limited to the duration specified in the main operating plan or which concern special measures. Such measures can be, for example

  • Handling of substances hazardous to water,
  • utilization of foreign materials,
  • landslides on embankments,
  • the construction of a gas drying plant,
  • the construction of treatment plants or exploration facilities,
  • geophysical work,
  • seismic exploration work,
  • carrying out deep drilling,
  • measures for the recultivation of former mining areas or
  • the construction of roads and access routes,
  • Construction of filling stations and weighbridges,
  • Construction of power generation facilities ("mine power plant"),
  • monitoring.
Special operating plan procedures are only suitable for procedures in which no environmental impact assessment (EIA) is required.