Cookies erleichtern die Bereitstellung unserer Dienste. Mit der Nutzung unserer Dienste erklären Sie sich damit einverstanden, dass wir notwendige Cookies verwenden. Die Verwendung optionaler Cookies können Sie ablehnen oder nur bestimmte Cookies zulassen.

mixins.searchInfo_searchTermDevelopment plan

Development plan

Source: BUS Rheinland-Pfalz

Before plans are made to build on a plot of land, you should clarify whether a development plan exists for the plot or, if applicable, what stipulations are made in this development plan. If there is no development plan, the permissibility of building projects in outdoor areas and unplanned inner areas is governed by the German Building Code (BauGB).

The development plan stipulates in a legally binding manner which buildings and other facilities are permitted on a property.

A qualified development plan specifies at least the following

  • the type of building use (e.g. residential, mixed, commercial area),
  • the extent of building use (e.g. number of storeys and floor area, height, number of full storeys),
  • the area of the property that can be built on (e.g. building lines, building boundaries),
  • the local traffic areas.
Special information for Association Asbach

Content of the land performance

Before plans are made for building on a plot of land, you should clarify whether a development plan exists for the plot or, if so, what stipulations are made in this development plan. If there is no development plan, the permissibility of building projects in outdoor areas and unplanned inner areas is governed by the German Building Code (BauGB).

A development plan is adopted by the municipality as a statute. It becomes legally binding once it has been published in accordance with local custom.

The development plan stipulates in a legally binding manner which buildings and other facilities are permitted on a property.

In a qualified development plan, at least the following stipulations are made

  • the type of building use (e.g. residential, mixed, commercial area),
  • the extent of building use (e.g. number of storeys and floor area, height, number of full storeys),
  • the area of the plot that can be built on (e.g. building lines, building boundaries),
  • the local traffic areas.

The nearest responsible office to you:

Verbandsgemeinde Asbach - Bau- und Rechtsamt

Flammersfelder Straße 1
53567 Asbach
02683 9120
02683 912334

Show all information