Apply for permission to withdraw and discharge water from surface waters
Source: BUS Rheinland-Pfalz- The responsible Structural and Approval Directorate North or South, Rhineland-Palatinate, will explain the permit procedure for withdrawing water from surface waters.
- You prepare the application documents with the help of a specialist planner and submit them.
- The responsible Structural and Approval Directorate North or South checks your application documents. If necessary, you submit any additional documents required.
- The responsible Structural and Approval Directorate North or South checks your subsequently submitted documents.
- The responsible Structural and Approval Directorate North or South will issue a notice of approval or rejection on the basis of the reviewed and, if applicable, subsequently submitted application documents.
- You will receive the decision together with a notification of fees.
- You pay the administrative fee.
In Rhineland-Palatinate, the Structural and Approval Directorate North and the Structural and Approval Directorate South are responsible.
Certificate of competence
Fee: 36,10 - 9000,00 EURPayment in advance: nohttps://landesrecht.rlp.de/bsrp/document/jlr-UmwMinGebVRP2019rahmenSimple permission
Fee: 36,10 - 35000,00 EURPayment in advance: nohttps://landesrecht.rlp.de/bsrp/document/jlr-UmwMinGebVRP2019rahmenSimple permit with included approval of the water supply system
Fee: 265,00 - 13290,00 EURPayment in advance: nohttps://landesrecht.rlp.de/bsrp/document/jlr-UmwMinGebVRP2019rahmenHigh permission
Fee: 265,00 - 26580,00 EURPayment in advance: nohttps://landesrecht.rlp.de/bsrp/document/jlr-UmwMinGebVRP2019rahmenHigh-level permit with included approval of the water supply system
State Office for the Environment
01.12.2023
For online application:
The nearest responsible office to you:
Struktur- und Genehmigungsdirektion Nord
Address
56068 Koblenz
Transport connection
Stop Stadttheater
- Bus:
- ab Hauptbahnhof - Linien 3/13, 8, 9, 358, 46, Linie 9
Postal address
56003 Koblenz
Transport connection
Stop Stadttheater
- Bus:
- ab Hauptbahnhof - Linien 3/13, 8, 9, 358, 46, Linie 9
Contact
Telephone
Fax
Website
Struktur- und Genehmigungsdirektion Süd
Address
67433 Neustadt an der Weinstraße
Transport connection
Stop Neustadt an der Weinstraße - Hbf
Postal address
67402 Neustadt an der Weinstraße